Modification to existing boilers to meet Industrial Emissions Directive.

Contract notice - utilities

Services

Directive 2004/17/EC

Section I: Contracting entity

I.1)Name, addresses and contact point(s)

AES Ballylumford Limited
Ballylumford Power Station, Islandmagee
For the attention of: Paul Robinson
BT40 3RS Larne
UNITED KINGDOM
Telephone: +44 2893381251
E-mail:
Fax: +44 2893381236

Internet address(es):

General address of the contracting entity: www.aes.com

Further information can be obtained from: The above mentioned contact point(s)

Specifications and additional documents (including documents for a dynamic purchasing system) can be obtained from: The above mentioned contact point(s)

Tenders or requests to participate must be sent to: The above mentioned contact point(s)

I.2)Main activity
Electricity
I.3)Contract award on behalf of other contracting entities
The contracting entity is purchasing on behalf of other contracting entities: no

Section II: Object of the contract

II.1)Description
II.1.1)Title attributed to the contract by the contracting entity:
Modification to existing boilers to meet Industrial Emissions Directive.
II.1.2)Type of contract and location of works, place of delivery or of performance
Services
Service category No 1: Maintenance and repair services
Main site or location of works, place of delivery or of performance: AES Ballylumford Power Station, Islandmagee, Larne, County Antrim, Northern Ireland. BT40 3RS.

NUTS code UKN

II.1.3)Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
The notice involves a public contract
II.1.4)Information on framework agreement
II.1.5)Short description of the contract or purchase(s):

Modification of existing boilers at Ballylumford Power Station to ensure they meet the requirements of Industrial Emissions Directive (‘IED’) Annex V Part 2 emissions limit in that they emit combustion products which contain less than 100 mg/Nm3 of NOx and CO corrected to 3 % O2 and dust less than 5 mg/Nm3 across the units' full operating range of 60 to 180 MW.

The estimated value of the contract is between 4 000 000,00 GBP to 9 000 000,00 GBP.
II.1.6)Common procurement vocabulary (CPV)

42162000, 42164000, 44621200, 45331110, 50531100, 42310000, 51130000, 51135100, 45262640

II.1.7)Information about Government Procurement Agreement (GPA)
The contract is covered by the Government Procurement Agreement (GPA): no
II.1.8)Information about lots
This contract is divided into lots: no
II.1.9)Information about variants
Variants will be accepted: no
II.2)Quantity or scope of the contract
II.2.1)Total quantity or scope:

Modification of existing boilers at Ballylumford Power Station to ensure they meet the requirements of Industrial Emissions Directive (‘IED’) Annex V Part 2 emissions limit in that they emit combustion products which contain less than 100 mg/Nm3 of NOx and CO corrected to 3% O2 and dust less than 5 mg/Nm3 across the units' full operating range of 60 to 180 MW.

To replace the existing 12 low NOx burners supplied by Babcock and Wilcox in the 1990's with 12 Ultra low NOx burners that employ 'Best Available Techniques' or other processes that would meet the IED emissions targets.

Carry out modifications to the existing windbox to accommodate the new burners or other processes.
Eliminate as far as possible, flame impingement on the water wall and super heater sections of the boiler.
Improve and simplify both the burner management system and the boiler control system for the units.
Minimise disruption to the existing steam, water, fuel and air and gas equipment.
Optimise the unit's capability to generate up to 180 MW's with gas fuel only.
The modifications to the boiler must have no detrimental effect on the existing boiler efficiency and should ideally result in an efficiency gain.
Estimated value excluding VAT
Range: between 4 000 000 and 9 000 000 GBP
II.2.2)Information about options
Options: no
II.2.3)Information about renewals
This contract is subject to renewal: no
II.3)Duration of the contract or time limit for completion

Section III: Legal, economic, financial and technical information

III.1)Conditions relating to the contract
III.1.1)Deposits and guarantees required:
The contracting entities reserves the right to require bonds, deposits, guarantees or other appropriate forms of undertaking or security to secure proper performance of the contract.
III.1.2)Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them:
The payments terms and details of the form of contract shall be provided in the Invitation to Tender documentation to be issued to those applicants who qualify for the tendering stage of the competition.
III.1.3)Legal form to be taken by the group of economic operators to whom the contract is to be awarded:
The contacting entities reserves the right to require groups of economic operators to take a particular legal form upon contract award or to require that one party has primary liability or to require each party to be jointly and severally liable. The contracting authorities also reserves the right to require bonds, deposits, guarantees, collateral warranties or other appropriate forms of undertaking or security to secure proper performance of the contract.
III.1.4)Other particular conditions:
The performance of the contract is subject to particular conditions: no
III.2)Conditions for participation
III.2.1)Personal situation of economic operators, including requirements relating to enrolment on professional or trade registers
Information and formalities necessary for evaluating if the requirements are met: Applicants (and consortium members, if any) shall be assessed in accordance with Part 4 of the Utilities Contracts Regulations 2006, as amended (implementing Title II, Chapter VII, Section 2 of Directive 2004/17) - including but not limited to Regulation 26 thereof - on the basis of information provided in response to the Pre-Qualification Questionnaire documentation (which is available from the contact point referred to above). Completed Pre-Qualification Questionnaire Documents are to be submitted to the contracting entity by the date specified in Section IV.3.4.
III.2.2)Economic and financial ability
Information and formalities necessary for evaluating if the requirements are met: Applicants shall be assessed in accordance with Part 4 of the Utilities Contracts Regulations 2006, as amended (implementing Title II, Chapter VII, Section 2 of Directive 2004/17) - including Regulation 27 thereof - on the basis of information provided in response to the Pre-Qualification Questionnaire Documentation (which is available from the contact point referred to above), and in particular, PQQ Parts C and F thereof. Completed Pre-Qualification Questionnaire Documents are to be submitted to the contracting entity by the date specified in Section IV.3.4.
III.2.3)Technical capacity
Information and formalities necessary for evaluating if the requirements are met: Applicants shall be assessed in accordance with Part 4 of the Utilities Contracts Regulations 2006, as amended (implementing Title II, Chapter VII, Section 2 of Directive 2004/17) - and in particular Regulation 27 thereof - on the basis of information provided in response to the Pre-Qualification Questionnaire Documentation (which is available from the contact point referred to above) and in particular Parts D, G and H thereof. Completed Pre-Qualification Questionnaire Documents are to be submitted to the contracting entity by the date specified in Section IV.3.4.
III.2.4)Information about reserved contracts
III.3)Conditions specific to services contracts
III.3.1)Information about a particular profession
Execution of the service is reserved to a particular profession: no
III.3.2)Staff responsible for the execution of the service
Legal persons should indicate the names and professional qualifications of the staff responsible for the execution of the service: no

Section IV: Procedure

IV.1)Type of procedure
IV.1.1)Type of procedure
Negotiated
Some candidates have already been selected (if appropriate under certain types of negotiated procedures): no
IV.2)Award criteria
IV.2.1)Award criteria
The most economically advantageous tender in terms of the criteria stated in the specifications or in the invitation to tender or to negotiate
IV.2.2)Information about electronic auction
An electronic auction will be used: no
IV.3)Administrative information
IV.3.1)File reference number attributed by the contracting entity:
BLFD2014 - 06 Boiler modiffications to meet IED.
IV.3.2)Previous publication(s) concerning the same contract
no
IV.3.3)Conditions for obtaining specifications and additional documents
Payable documents: no
IV.3.4)Time limit for receipt of tenders or requests to participate
25.4.2014 - 17:00
IV.3.5)Language(s) in which tenders or requests to participate may be drawn up
English.
IV.3.6)Minimum time frame during which the tenderer must maintain the tender
IV.3.7)Conditions for opening of tenders

Section VI: Complementary information

VI.1)Information about recurrence
This is a recurrent procurement: no
VI.2)Information about European Union funds
The contract is related to a project and/or programme financed by European Union funds: no
VI.3)Additional information:

A Pre-Qualification Questionnaire will be provided through the AES procurement website. Applicants must request a password and username for access to the website. The request for a password and username should be addressed in writing to the Procurement Manager at AES . as per details provided Section 1.1 of this Notice.

All information must be completed and returned as instructed in the Pre-Qualification Questionnaire and Information Memorandum. The response will be assessed as outlined in the PQQ and Information Memorandum.
Re II.2.1 above, this is an estimated value only. The contracting entity reserves the right to award a contract for a higher or lower amount.
Re IV.3.4 above, requests to participate (i.e. completed pre-qualification documents) should be submitted to Paul Robinson, Ballylumford Power Station, Islandmagee, Larne, County Antrim, Northern Ireland BT40 3RS.
VI.4)Procedures for appeal
VI.4.1)Body responsible for appeal procedures
VI.4.2)Lodging of appeals
Precise information on deadline(s) for lodging appeals: The contracting entity will commence the standstill period at the point information on the award of the contract is communicated to tenderers. That notification will contain the information specified in Regulation 32 of the Utilities Contracts Regulations 2006 (as amended). Pursuant to Regulation 45D, legal proceedings must generally be started within 30 days beginning with the date when the economic operator first knew or ought to have known that grounds for starting the proceedings had arisen, although a Court can extend the period for bringing proceedings to up to 3 months (after the date when the economic operator first knew or ought to have known that grounds for starting the proceedings had arisen) where the Court considers that there is a good reason for doing so. A longer limitation period of 6 months can apply to any claim for a declaration of ineffectiveness (although this can in certain circumstances, specified in the Utilities Contracts Regulations 2006, be reduced to 30 days). The standstill period, which will be for a minimum of 10 calendar days, provides time for unsuccessful tenderers to challenge the award decision before the contract is entered into. The Utilities Contracts Regulations 2006 (as amended) provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court of Northern Ireland.
VI.4.3)Service from which information about the lodging of appeals may be obtained
VI.5)Date of dispatch of this notice:
27.3.2014